Installation Job Closeout Checklist

Our Quality Control Team will evaluate the following for job closeout.

A
Written by Alicia Gibbs
Updated over a week ago
  • Permit/ Planset

  • Interconnection

  • AC Disconnect

  • OCPD Closeup

  • Inverter Wiring

  • Inverter Side Label

  • Revenue Grade Meter

  • Cell Kit Closeup

  • Conduit Run

  • VoC

  • Utility Meter with Label

  • BoS Stickers

  • BoS Overview Pullback

  • Commissioning

  • Attachments/ Sealant

  • Racking/ Wire Management

  • Opto Mounted

  • Soladeck/ Junction Box

  • Sticker Map/ Stringing

  • Module Attachments

  • Tilt

  • Under Array

  • Complete Array(s)

  • Shade Report

  • Production Curve

  • Full Planset Revision

  • Site Map