High-Quality Installations

Keep in mind the appearance of the customer’s home and system.

A
Written by Alicia Gibbs
Updated over a week ago

Review the design with the customer, and explain to them what the panels will look like on their home once installed.


Seal any missed pilot holes and holes from any nails you may have removed to prevent roof leaks later on.


Be sure the attachment flashing is properly aligned and square, and level the array for perfectly aligned modules.


Trim excess space on the rails to the exact same length on both sides of the array, and hide ends with a hidden end clamp.


Create and follow a wiring diagram for proper wire management. SolaDecks must be used to facilitate internal conduit runs where there is enough attic space present.


Be sure to leave the customer's home and roof in excellent condition. Clean up the roof and job site often during and after installation.

If you have any issues, please contact the Palmetto Install Hotline

[email protected] or (843) 258-5389.

Hotline hours are 8 a.m. to 5 p.m. EST, Monday through Friday.

Did this answer your question?